The best painters for strata and owners corporation buildings are the ones who quote against a single written scope, coordinate access without upsetting residents, and give the committee something it can actually put to a vote. On strata work the paint is the cheap part. Access, staging and coordination drive the price far more than materials do, which is why two quotes for the same building can differ by tens of thousands of dollars and still both be honest.
How Victorian committees usually run it
The process that works, and the one most owners corporation managers on the Peninsula follow, looks like this.
- Commission or write one detailed scope of works covering surfaces, preparation, products, coats, access method and staging.
- Issue that same scope to three contractors so the quotes are genuinely comparable.
- Check registration, insurance and referees before shortlisting, not after.
- Put the recommendation to the committee or general meeting with the scope attached.
- Agree the program, resident notification process and access arrangements in writing.
Three quotes against three different scopes is not a comparison, it is a guessing game, and the best painters will ask for a scope before pricing. Getting the scope written first is the single highest-value thing a committee can do.
Insurance and registration in Victoria
Two thresholds matter. In Victoria, domestic building work over $16,000 requires domestic building insurance, and registration requirements apply to domestic building work over $10,000. Most strata repaint projects sit well above both.
Ask each contractor to confirm their registration and to provide the domestic building insurance certificate for the contract value before work starts. Confirm public liability cover as well, along with a safe work method statement for the specific building.
Realistic cycles and what they cost
Facades typically run on a seven to ten year repaint cycle, and interior common areas on five to ten years. On the Peninsula, coastal exposure pushes facades toward the shorter end, because salt deposition holds moisture against the surface and UV degrades the coating binder. West-facing elevations and metal fixings fail first.
| Element | Typical cycle |
|---|---|
| Facades and exterior elements | 7 – 10 years, shorter near the ocean |
| Interior common areas | 5 – 10 years |
| Balustrades, handrails and steelwork | Inspect annually, treat as needed |
Common area painting for smaller blocks typically falls between $8,000 and $25,000. That is a wide band because a walk-up block with ground-level access and a building needing swing stages or full scaffold are completely different projects. A site inspection is essential before any figure is put in front of owners.
What drives the price
- Access. Scaffold, boom lifts and swing stages can exceed the cost of the painting labour on a taller building.
- Staging. Working around residents means more setup and pack-down cycles than a vacant site.
- Remedial work. Render repairs, rust treatment on balustrades, sealant replacement and timber repairs are usually found on survey.
- Coordination. Notification, key and fob access, car park closures and courtesy of programming all take time.
- Substrate mix. Most blocks combine render, masonry, timber and metal, each needing its own system.
Keeping residents on side
Most complaints on strata jobs are about communication, not paint. Written notices before each stage, clear dates for balcony access, protection of vehicles and plants, and daily tidy-up prevent almost all of them.
Peninsula blocks add a wrinkle, because many apartments are holiday properties that are empty for long stretches or let out at peak times. Programming works for the shoulder season and coordinating access to unoccupied units is part of the job here in a way it is not in the city.
Who to hire
The best painters for strata work will attend a committee meeting, provide a staged program with dates, and put every exclusion in writing. SG Coatings is Dulux Accredited, a Master Painters Australia member, female-led with women on the tools, and holds around seventy Google reviews at 4.9 stars.
See our strata and owners corporation painting service for how we scope and stage this work, and planned maintenance for buildings that would rather spread the cost across the cycle. Owners of individual apartments used as second homes can look at holiday home painting on the Mornington Peninsula. To get a scope and a comparable quote, contact us through our contact page and we will walk the building with your manager.
Frequently Asked Questions
How many quotes does an owners corporation need for painting?
Committees typically seek three comparable quotes, and the important word is comparable. All three should price the same written scope covering surfaces, preparation, products, number of coats, access method and staging. Without a common scope, price differences reflect different assumptions rather than different value, and the cheapest quote is usually the thinnest one.
Does strata painting require domestic building insurance in Victoria?
Domestic building work over $16,000 requires domestic building insurance in Victoria, and registration requirements apply to work over $10,000. Most strata repaint contracts exceed both thresholds. Ask each contractor to provide their registration details and the insurance certificate for the contract value before any work begins on site.
How often should a strata building be repainted?
Facades generally run on a seven to ten year cycle and interior common areas on five to ten years. Buildings close to the ocean sit at the shorter end, because salt and UV shorten coating life considerably. Annual inspection of balustrades, handrails and metal fixings will catch corrosion long before it becomes a major cost.
What does painting strata common areas cost?
For smaller blocks, common area painting typically falls between $8,000 and $25,000. Access equipment, staging around residents and remedial repairs move that figure far more than paint selection does. Because access dominates the cost, a site inspection and a written scope are needed before any number should be presented to owners.